HighTec Energy provided Front End Engineering Design followed by Detailed Engineering Design for a new 100,000 barrels per day refinery to be located in Africa
Refinery will consist of three trains, and common FCC Unit
Project Milestones
Refinery construction will be divided into two Phases:
Phase 1: First 30,000 barrels per day Train
Phase 2: 35,000 barrels per day for Trains 2 & 3
All Trains: Addition of advanced refining capabilities to expand specialized refined products
Ex: VFO (Vacuum Fuel Oil) to be converted into Diesel and increased LPG cuts (which will allow you to build an “on-demand” PDH plant)
Design Basis
Front End Engineering Design parameters based off provided crude slate (API = 26)
HYSYS by Aspen Tech was used as the design modeling software
Benefits of a multi-train Refinery:
Allows refinery to get up and going with future addition of heavier processing to convert
If one train goes down, you do not lose 100% of your refining capability